Four trades. One crew.
Everything below is built by the same small team, on a fixed price, with a written two-year warranty on the workmanship.

01 — Kitchens
Kitchen remodels
A kitchen works when the walk from fridge to stove to sink feels like nothing at all. We start there, with a layout drawn around how you cook, and build the cabinetry, counters and lighting to match.
Most full remodels take six to ten weeks. We build a temporary kitchen setup so dinner doesn’t stop.
What’s included
- 01Layout design and 3D plan you can walk through
- 02Demolition, disposal and dust containment
- 03Electrical, plumbing and gas by licensed trades
- 04Custom or semi-custom cabinets, installed and tuned
- 05Countertops: quartz, granite, soapstone or butcher block
- 06Tile backsplash, flooring and trim carpentry
- 07Lighting plan: under-cabinet, pendant and recessed
- 08Permits, inspections and final walk-out

02 — Baths
Bathroom renovations
Water finds every mistake. We waterproof every shower the same way, every time, and test it before a single tile goes up. The result is a bathroom you stop worrying about.
A standard hall bath takes two to three weeks. Primary suites run four to six.
What’s included
- 01Full demo and subfloor repair where needed
- 02Waterproof shower systems, flood-tested
- 03Tile: floors, walls, niches, benches, curbless entries
- 04Vanities, mirrors, lighting and fans that vent outdoors
- 05Plumbing fixtures supplied or installed to your spec
- 06Heated floors and radiant options
- 07Accessibility and aging-in-place upgrades
- 08Permits and inspections handled

03 — Decks & porches
Decks & porches
Most decks fail at the ledger and the footings, long before the boards go. We build the part you can’t see to last, then finish the part you can with cedar, pressure-treated or composite, whichever suits you.
A typical deck goes up in one to two weeks, weather allowing. We pull the permit.
What’s included
- 01Engineered footings below the frost line
- 02Properly flashed and bolted ledger connection
- 03Pressure-treated, cedar, mahogany or composite decking
- 04Railings, stairs and built-in benches
- 05Screened porches and pergolas
- 06Lighting and low-voltage wiring
- 07Demo and disposal of the old deck
- 08Stain or seal at completion

04 — Additions
Additions
A good addition looks like it was always there. We match rooflines, siding and window proportions, and tie new framing into old so the seam disappears inside and out.
Bump-outs take six to ten weeks. Full second-story additions run four to six months.
What’s included
- 01Architectural drawings and engineered plans
- 02Foundation, framing and roof tie-in
- 03Windows, doors, siding and trim matched to the house
- 04Insulation and air sealing to current energy code
- 05HVAC, electrical and plumbing extensions
- 06Interior finish: drywall, flooring, paint, cabinets
- 07Zoning, permits and every inspection
- 08Weekly written progress updates
Tell us about the job.
Free walk-through, written quote within a week. We call back the same day and we don’t chase you afterward.